🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$131.99
Naturehike 25L Swimming Buoy Two Airbags Swim Buoy Dry Bag Waterproof Beach Bag with Adjustable Waist Belt for Swimmers Coastal Beach - Green — image 1
Dry BagsNaturehike✓ In stock

Naturehike 25L Swimming Buoy Two Airbags Swim Buoy Dry Bag Waterproof Beach Bag with Adjustable Waist Belt for Swimmers Coastal Beach - Green

★★★★★
$131.99

Options

4 available
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • 【Upgrade with Waterproof Phone Pocket】: Equipped with an IPX8 certified waterproof mobile phone pocket, you can use your phone freely in the water without worrying about water damage.
  • 【VARIETY OF COLORS】: We offer four bright colors for you to choose: orange, pink, green and yellow. These are not only aesthetically pleasing, but also fulfill a warning function to ensure your safety in the water.
  • 【LARGE MAIN COMPARTMENT】 25L main compartment provides ample space for clothes, towels, keys, groceries and other everyday items. Thanks to the rollable closure, your belongings are guaranteed to stay dry.
  • Versatile detail upgrades: Equipped with an adjustable and removable waist belt that adapts to different waist sizes. Upgrade with double layer double sided eco-friendly valve, reinforced and widened webbing and durable PVC handle. In addition, a four-layer nylon fabric is used, which achieves a waterproof rating of IPX6.
  • 【Lightweight & Portable】: The total weight is approx. 716g, which makes transportation very convenient. Whether in the pool or in the sea, it offers you buoyancy of up to 18N to support you swimming in the water.
  • 【Customer Service】: We offer comprehensive customer service. If you encounter any problems with the product, you can communicate with our service team at any time. We guarantee you an all-round satisfactory shopping experience.
Product description

Description Color: Orange, Pink Material: Nylon/PVC. Inflated product size: 36 x 72 cm. Dimensions: approx. 50 x 25 cm. Capacity: 28 litres Weight: about 600g Air nozzle: octagonal spiral nozzle. Box contents: 1 x pool bag x 1 belt. Usage: swimming, diving, beach, fishing

Product details
Brand
Naturehike
Material
Nylon
Colour
Green/25l
Size
25L
Model number
6977465862921
Part number
6977465862921
EAN
6927595735688

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
★★★★★
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026
★★★★★

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025
★★★★★

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1–2 of 10 reviews

You might also like

Similar items

View all →