🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$28.99
Natural Wicker Storage Basket with Lining Hamper Baskets for Gifts Empty Baskets for Shelves (Grey Washed, Medium) — image 1
Storage Boxesgreen leaves✓ In stock

Natural Wicker Storage Basket with Lining Hamper Baskets for Gifts Empty Baskets for Shelves (Grey Washed, Medium)

★★★★★
$28.99

Options

4 available
Size: Medium
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • 【Extraordinary Outlook】 Crafted to offer both Functionality and Aesthetic Appeal. The Grey Washed Dye used on our Baskets is a ideal match with the Heart-shaped Pendant, the Cotton Liner can Protect the Contents Safe and Clean.
  • 【Design Principle】 The Basket is Designed to reflect the Nature and Comfortability. Made from Eco-Friendly, Renewable Wicker, this Wicker Hamper is both Stylish and Environmentally responsible.
  • 【Applied Occasions】 Restaurant/Store Trade Countertop: In a Home or Restaurant or Store Setting, the Wicker Basket can be Used as a Display or Countertop Organizer. Sweet Gift Basket: Fill the Wicker Basket with an Assortment of Delicious Treats, and Present it as a Thoughtful Gift for Birthdays, Holidays, or Special Occasions.
  • 【Sustainable Quality】 Made with Durable Wicker Materials, this Basket with Robust Construction is designed to Withstand the Rigors of Gift-giving while Maintaining its Elegant Appearance.
  • 【Product Specification】 Small Size External Measurements: Width 28 cm Depth 19 cm Height 12 cm Medium Size External Measurements: Width 33 cm Depth 23 cm Height 15 cm Large Size External Measurements: Width 39 cm Depth 29 cm Height 17 cm
  • 【CUSTOMER SUPPORT】We are here to ensure you have a great shopping experience. For any inquiries, contact us during our service hours: Monday to Friday, 9 AM – 3 PM (Bank Holidays Excluded).
Product details
Brand
green leaves
Manufacturer
green leaves
Material
Wicker
Colour
Grey Washed
Size
Medium
Model number
2063
EAN
5060618627612

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
★★★★★
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026
★★★★★

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025
★★★★★

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1–2 of 10 reviews

You might also like

Similar items

View all →