๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$247.99
Home/Lighting/Outdoor Lighting/Pathway Lighting
SLV inground Light DASAR 80 / Spot for Terrace, Outdoor spot, recessed Light Garden, Outdoor Floor Light / GU10 IP67 35W Stainless Steel โ€” image 1
Pathway LightingSLVโœ“ In stock

SLV inground Light DASAR 80 / Spot for Terrace, Outdoor spot, recessed Light Garden, Outdoor Floor Light / GU10 IP67 35W Stainless Steel

โ˜…โ˜…โ˜…โ˜…โ˜…
$247.99

Options

2 available
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • AMBIENCE: The inground light emits a high-quality light and creates a pleasant outdoor atmosphere.
  • MINIMALIST DESIGN: The inground light is made from stainless steel 316 and its simple shape blends seamlessly into any environment. It doesn't matter whether it's a garden, terrace, faรงade or entrance.
  • FUNCTIONAL: The SLV lamps mean this inground light offers a high-quality long life illumination. Lamps not included
  • CONSISTENT APPEARANCE: The SLV range includes lots of appropriate lights for effective external lighting.
  • GERMAN ENGINEERING: In-house development and quality testing in Germany form the basis for an excellent product experience. Your new SLV product comes with a 5-year guarantee.
Product details
Brand
SLV
Manufacturer
SLV
Material
Stainless Steel 316
Colour
Stainless Steel
Size
22 x 16 cm
Weight
1.00 kg
Model number
229320
Part number
229320
EAN
4024163113366

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’