🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$10.09
True HQ 4K HDMI Cable 5m, High Speed 18Gbps (HDMI 2.0), 4K@60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet – Lead for TV, Projector, Monitor, PS5, Xbox — image 1
HDMI CablesTrue HQ✓ In stock

True HQ 4K HDMI Cable 5m, High Speed 18Gbps (HDMI 2.0), 4K@60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet – Lead for TV, Projector, Monitor, PS5, Xbox

$10.09
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • 5m 4K HDMI Cable: High Speed lead for 4K UHD TVs, monitors and projectors. Ideal for living rooms, gaming desks and home-cinema setups. Supports HDR and HDCP 2.2/1.4, and is backwards compatible with earlier HDMI devices.
  • HDMI 2.0 / 18Gbps Bandwidth: Supports up to 4K@60Hz, 1440p@144Hz, 1080p@240Hz (device/settings dependent). Works with HDR10, Dolby Vision, ARC, Dolby Atmos and DTS-HD (when supported) for enhanced picture detail and multi-channel audio.
  • Reliable Build Quality: Reinforced gold-plated connectors with an aluminium alloy shell, quality copper conductors and a flexible soft-matte PVC jacket. Triple-layer shielding helps reduce interference for a consistent signal on 5m runs.
  • Wide Compatibility: Connects to HDMI-enabled 4K & Full HD TVs, monitors and projectors, as well as PCs/laptops, AV receivers and soundbars. Ideal for Sky/Virgin boxes, streaming devices and gaming consoles like PS5 and Xbox Series X.
  • UK Brand, Dedicated Support: Designed by a UK brand committed to dependable build quality and responsive customer service. Available in multiple lengths (2m–30m) for home cinema, gaming and professional AV installations.
Product details
Brand
True HQ
Manufacturer
True HQ
Colour
Black
Size
5M

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 12 of 10 reviews

You might also like

Similar items

View all →