🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$29.17
True HQ 4K HDMI Cable 25m, High Speed 18Gbps (HDMI 2.0), 4K@60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet – Extra Long Lead for TV, Projector, Monitor, PS5, Xbox — image 1
HDMI CablesTrue HQ✓ In stock

True HQ 4K HDMI Cable 25m, High Speed 18Gbps (HDMI 2.0), 4K@60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet – Extra Long Lead for TV, Projector, Monitor, PS5, Xbox

$29.17
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • 25m 4K HDMI Cable (Extra-Long Runs): High-speed lead for 4K UHD TVs, monitors & projectors. Ideal for long home-cinema routes, offices, meeting rooms and projector installs. HDCP 2.2/1.4, HDR support, backwards compatible.
  • HDMI 2.0 / 18Gbps: Up to 4K@60Hz (device/settings dependent). On 25m runs, many setups are more stable at 4K@30 or 1080p - try another HDMI port, lower output settings, or add a powered HDMI booster/repeater for long distances.
  • Reliable Long-Distance Build: Reinforced gold-plated connectors with aluminium alloy shell, 28AWG high-purity copper and flexible soft-matte PVC jacket. Triple-layer shielding helps reduce interference for a consistent signal over long runs.
  • Wide Compatibility + Features: Works with HDMI TVs/monitors/projectors, PCs, AV receivers & soundbars, Sky/Virgin, streaming devices and PS5/Xbox. Supports HDR10/Dolby Vision, ARC, Dolby Atmos & DTS-HD (when supported).
  • UK Brand, Dedicated Support: Designed by a UK brand focused on dependable build quality and responsive help. Choose the right length (2m-30m) for home cinema, gaming, offices, meeting rooms and professional AV installs.
Product details
Brand
True HQ
Manufacturer
True HQ
Colour
Black
Size
25M

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 12 of 10 reviews

You might also like

Similar items

View all →