🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$17.55
True HQ 4K HDMI Cable 15m, High Speed 18Gbps (HDMI 2.0), 4K@60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet – Long Lead for TV, Projector, Monitor, PS5, Xbox — image 1
HDMI CablesTrue HQ✓ In stock

True HQ 4K HDMI Cable 15m, High Speed 18Gbps (HDMI 2.0), 4K@60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet – Long Lead for TV, Projector, Monitor, PS5, Xbox

$17.55
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • 15m 4K HDMI Cable (Long Runs): High-speed lead for 4K UHD TVs, monitors & projectors. Ideal for wall TVs, offices and home-cinema setups where equipment is further apart. HDCP 2.2/1.4, HDR support, backwards compatible.
  • HDMI 2.0 / 18Gbps: Up to 4K@60Hz, 1440p@144Hz, 1080p@240Hz (device/settings dependent). On 15m runs, results can vary by device/HDMI port - try another port, enable 4:2:0 if available, or reduce output to 4K@30/1080p.
  • Reliable Build Quality: Reinforced gold-plated connectors with aluminium alloy shell, 28AWG high-purity copper and flexible soft-matte PVC jacket. Triple-layer shielding helps reduce interference for a stable picture over longer runs.
  • Wide Compatibility + Features: Works with HDMI TVs/monitors/projectors, PCs, AV receivers & soundbars, Sky/Virgin, streaming devices and PS5/Xbox. Supports HDR10/Dolby Vision, ARC, Dolby Atmos & DTS-HD (when supported).
  • UK Brand, Dedicated Support: Designed by a UK brand focused on dependable build quality and responsive help. Choose the right length (2m-30m) for home cinema, gaming, office display setups and professional AV installs.
Product details
Brand
True HQ
Manufacturer
True HQ
Colour
Black
Size
15M

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 12 of 10 reviews

You might also like

Similar items

View all →