🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$56.99
True HQ 4K HDMI Cable 10m, High Speed 18Gbps (HDMI 2.0), 4K@60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet – Long Lead for TV, Projector, Monitor, PS5, Xbox — image 1
HDMI CablesTrue HQ✓ In stock

True HQ 4K HDMI Cable 10m, High Speed 18Gbps (HDMI 2.0), 4K@60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet – Long Lead for TV, Projector, Monitor, PS5, Xbox

$56.99

Options

6 available
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • 10m 4K HDMI Cable: Long-reach lead for TVs, monitors and projectors—ideal for home cinema, classrooms and meeting rooms. Supports HDR and HDCP 2.2/1.4, and is backwards-compatible with earlier HDMI versions.
  • HDMI 2.0 / 18Gbps Bandwidth: Supports up to 4K@60Hz, 1440p@144Hz, 1080p@240Hz (device/settings dependent). Works with HDR10, Dolby Vision, ARC, Dolby Atmos and DTS-HD (when supported) for enhanced picture detail and multi-channel audio.
  • Reliable Long-Distance Build: Reinforced gold-plated connectors with an aluminium alloy shell, 28AWG high-purity copper conductors and a flexible soft-matte PVC jacket. Triple-layer shielding helps reduce interference for a consistent signal over long runs, including 10m installations.
  • Wide Compatibility: Connects to HDMI-enabled 4K & Full HD TVs, monitors and projectors, as well as PCs/laptops, AV receivers and soundbars. Ideal for Sky/Virgin boxes, streaming devices and gaming consoles like PS5 and Xbox Series X.
  • UK Brand, Multiple Lengths: Designed by a UK brand focused on dependable build quality and responsive customer support. Choose the right length (2m–30m) for home cinema, gaming, offices and professional AV installs.
Product details
Brand
True HQ
Manufacturer
True HQ
Colour
Black
Size
10M
Weight
0.20 kg
Model number
TRUEHQ-HDMI-10M
Part number
TRUEHQ-HDMI-10M
EAN
5060706610113

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 12 of 10 reviews

You might also like

Similar items

View all →