๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$126.99
YOGADOG - Durable 15 Ft to 50 Ft Dog Tracking / Training Lead Leash - Long Lead with Padded Handle - Special Non-slip Design - For any Szie of Dogs (50ft) โ€” image 1
Training LeadsYOOGAO Petโœ“ In stock

YOGADOG - Durable 15 Ft to 50 Ft Dog Tracking / Training Lead Leash - Long Lead with Padded Handle - Special Non-slip Design - For any Szie of Dogs (50ft)

โ˜…โ˜…โ˜…โ˜…โ˜…
$126.99

Options

3 available
Size: 50'
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • STURDY AND DURABLE - 50 ft long x 0.7 inch wide. High-quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain
  • SPECIAL NON-SLIP DESIGN - With woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog pulling.
  • COMFORTABLE PADDED HANDLE - With neoprene padded hand loop. Lightweight and comfortable in your hands.
  • CONVENIENT USE - Twisting resistant and waterproof. Suitable for any weather and any size of dogs.
  • International products have separate terms, are sold from abroad and may differ from local products, including fit, age ratings, and language of product, labeling or instructions.
Product description

International products have separate terms, are sold from abroad and may differ from local products, including fit, age ratings, and language of product, labeling or instructions.

Product details
Brand
YOOGAO Pet
Manufacturer
YOGADOG
Material
Nylon
Colour
Black
Size
50'
Weight
0.65 kg
Model number
TL-01-15m
Part number
TL-01-15m
EAN
6620472408186

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’