๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$163.99
Tiger Blackwash Toilet Seat, MDF, Black, 37.5 x 5.5 x 43 cm โ€” image 1
Toilet SeatsTigerโœ“ In stock

Tiger Blackwash Toilet Seat, MDF, Black, 37.5 x 5.5 x 43 cm

โ˜…โ˜…โ˜…โ˜…โ˜…
$163.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • The special hinges of the soft close closure allow the toilet seat to gently fall down. It is extremely quiet and safe for little hands. The dampers prevent damage to the ceramic of the toilet bowl
  • Even more comfortable due to the MDF material which quickly absorbs Body temperature
  • The even surface above and below the toilet seat makes cleaning easy without the annoying nooks and crannies where dirt can get stuck in
  • The paint makes these toilet seats easy
  • Mounting points can be adjusted from 10. 5 - 20 cm as desired
  • The toilet seat is resistant to UV rays and aggressive detergents and disinfectants
  • Made of 100% FSC wood
  • Comes as a complete set with toilet seat, mounting set with stainless steel hinges and a manual
Product details
Brand
Tiger
Manufacturer
Tiger
Material
Wood (MDF)
Colour
Blackone
Size
37,5x5,5x43 cm
Weight
2.65 kg
Model number
252030746
Part number
252030746
EAN
4008912520452

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’