

TERF® Multi Purpose Screws 4.0 X 70mm Pozi Flat Double Countersunk Zinc Yellow Screws For PVCu Wooden Timber Chipboard MDF and other similar types Screw Size 4.0 X 70mm - Pack of 100
Options
12 availableAbout this item
- Package Content : 100 Pcs [+/-2%] Pozi Flat Double Countersunk Screw 4.0 X 70mm ★【 Note 】:- Before Buy Please Check Your Require Screw Size
- Material : Made of Zinc Yellow Plated Hardened Steel [ Zinc yellow Passivation process of electroplating ]
- Pozi Flat Double Countersunk heads for flush fit
- Four additional points of contact, and does not have the rounded corners
- Suitable for use with many materials including PVCu, Timber, Chipboard, MDF, and other similar types
- Single threads, designed to offer higher pull out values and quicker insertion
- Please make your selection from the drop down menu. Image is for illustrative purposes
Product description
Product Description Terf multi-purpose pozi screws with Flat countersunk heads have a zinc yellow passivated finish for increased durability. The screws are immensely popular and versatile and used in all trades including joinery, electrical and plumbing. Also widely used in DIY applications. Suitable for use with many materials including PVCu, Timber,Chipboard, MDF and other similar types. The Zinc Yellow Passivation process of electroplating is similar to the 'Galvanised' and 'Zinc Plated' processes but with the addition of a yellow dye. It offers an aesthetically pleasing finish,whilst having excellent resistance to corrosion. The Pozidriv screw is similar in appearance to the classic Phillips cross-head, but in fact is very different.The Pozidriv has four additional points of contact and does not have the rounded corners that the Phillips screw drive has. The biggest advantage it offers is that, when used with the correct tooling in good condition, it does not came out, allowing great torque to be applied. The Pozidriv screw can easily be distinguished by a line embossed in the screw head at 45 degree to the slots for the driver. The countersunk head is designed to sink flush with substrates to leave a smooth surface finish. They have single threads, designed to offer higher pull out values and quicker insertion. Measures 4.0mm diameter by 70mm length. Box Contains 100 Pcs [+/-2%] Multi-Purpose Pozi Screw Note: Please read our product description for checking size carefully before purchase. Please allow slight errors on size due to manual measurement Please Use Health and Safety Equipment Before Use Screw Caution:Choking Hazard - Small Parts Not For Children Under 5 Year
Product details
Customer reviews
What customers say about Bigamart
10 Trustpilot reviews total, with 2 shown at a time.
I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.
The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.
You might also like
Similar items


ForgeFix Multi-Purpose Single Thread Screws | 4.0 x 70mm | Zinc Yellow Passivated | Box 200


