๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$44.99
TECHGEAR USB C to Lightning Cable [2M Apple MFi Certified] Strong Braided Lead for iPhone 14/1312/11/Pro/Max/Mini/X/XS/XR/XS Max /8/Plus, iPad 10.2" 10.9" Supports Power Delivery (for Type C Chargers) โ€” image 1
Lightning CablesTECHGEARโœ“ In stock

TECHGEAR USB C to Lightning Cable [2M Apple MFi Certified] Strong Braided Lead for iPhone 14/1312/11/Pro/Max/Mini/X/XS/XR/XS Max /8/Plus, iPad 10.2" 10.9" Supports Power Delivery (for Type C Chargers)

โ˜…โ˜…โ˜…โ˜…โ˜…
$44.99

Options

2 available
Size: 2m
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • Apple MFi: MFi certification and strict quality testing ensure your Apple devices are charged at their full potential safely, at maximum speed at a secure and stable voltage.
  • Power Delivery: Use together with an 18W or higher USB-C Power Delivery adapter (including Apple 29W, 30W, 61W, or 87W USB-C Power Adapter) to charge your compatible iPhone to 50% in just 30 minutes. Meaning a charge speed that is almost twice as fast as using a standard charger and cable. (Please ensure your iPhone/iPad supports PD charging to take advantage of the fast charge)
  • Long Life: Lasts 30ร— longer than ordinary cables and able to withstand 30000 bends. The nylon braided cable prevents unexpected scratches, damage and is tangle free
  • Fast Data Transfer: It offers data sync up to 480Mbps, transfer music, movie, files between iPhone and USB-C laptops in seconds.
  • Widely Compatible: This cable supports PD Fast Charge 3A (max) for iPad Pro 10.5", iPad Air 3rd Gen 10.5", iPad Mini 5th Gen, iPad 7th / 8th Gen 2020 10.2", and iPhone 12, 12 Pro, 12 Mini, 12 Pro Max, 11, 11 Pro, 11 Pro Max, XS Max, XS, XR, X, 8, 8 Plus and newer devices. It support the standard charge (5V/2.4A max) for iPhone 6 6s 7 8 / Plus. (Only iPhone 8 and the newer iPhones support PD fast charge). Works with DJI Mavic Air 2 Drone Remote Controller USB C to Apple Lightning iPhones / iPads
Product description

Brief: Sturdy braided nylon envelops a bulletproof fiber core, ensuring a lifespan thirty times longer than other cables. With full support for high-speed Power Delivery Charging, it's the only cable you'll ever need to buy. This TECHGEAR USB cable is designed to connect your iPhones and iPad to USB C equipped chargers for charging. This quality cable also allows to connect to USB C port on your laptop or desktop, in order to charge and exchange / sync data simultaneously. The nylon braided cable prevents unexpected scratches and damage. Power Delivered Works flawlessly with the USB-C Power Delivery high-speed charging protocol. Delivers a high-speed charge up to 3A (max) with the USB-C PD charger, to charge e.g. an iPhone X from 0% to 50% in 30 mins. Fast Data Transfer It offers data to sync up to 480Mbps, transfer music, movie, files between iPhone and USB-C laptops in seconds. Broad Compatibility Supports PD Fast Charge 3A (max) for iPad Pro 12.9" 2015 / 2017, iPad Pro 10.5", iPad Air 3rd Gen. 10.5", iPad Mini 5th Gen. 7.9", iPad 10.2" 8th 2020, and iPhone 14, 14 Plus, 14 Pro, 14 Pro Max, iPhone 13, 13 Mini, 13 Pro, 13 Pro Max, iPhone 12, 12 Pro, 12 Mini, 12 Pro Max, 11, 11 Pro, 11 Pro Max, XS Max, XS, XR, X, 8 Plus, 8, and more devices with lightning port. MFi Certified Certified to work with any device that uses a Lightning connector. Extra Long Length Longer size lets you use your device with convenience. This cable is longer than normal cables so you can leave it plugged in at hard to reach sockets and charge your device whilst using it. At 2m long, this is the perfect cable for your plug n play needs. Technical specifications Connector: USB Type C to Lightning Cable Length: 2M / 6.5ft Data Transfer Rate: upto 5 Gbps Power: upto 3A. Colour: Silver

Product details
Brand
TECHGEAR
Manufacturer
TECHGEAR SOLUTIONS
Colour
Silver
Size
2m
Model number
5056284418210
Part number
USB TypeC Braided -2m SIL
EAN
5056284418210

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’