🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$26.99
Spanner In The Works® | Purple Dog Lead For Large and Medium Dogs - Reflective Leashes, 1.5 Metre Long Lead, Thick 13mm Anti Pull Dog Leash | Comfort Handle, Strong, Upgraded 360 Swivel — image 1
Basic LeadsSpanner In The Works✓ In stock

Spanner In The Works® | Purple Dog Lead For Large and Medium Dogs - Reflective Leashes, 1.5 Metre Long Lead, Thick 13mm Anti Pull Dog Leash | Comfort Handle, Strong, Upgraded 360 Swivel

★★★★★
$26.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • 🐾 SAFETY FIRST: Safety is a priority, which is why we have manufactured a strong dog Lead with a reflective weave to the lead. This feature enhances visibility during low-light conditions, ensuring your dogs are visible to passing vehicles and pedestrians, ensuring their safety whilst walking or running.
  • 🐾 STRONG DOG LEAD: Suitable for use with either large or for use as dog leads for medium dogs. Whether you have a majestic Great Dane or a spirited Labrador, our 13mm rope dog lead is designed to cater to their needs. The thick 13mm anti-pull dog leash is perfect for strong, large dogs who tend to pull during walks.
  • 🐾 SUPERIOR DURABILITY: Crafted with care, our dog lead is made from robust 13mm climbing rope and a strong swivel. Ensuring strength and reliability that can withstand even the most adventurous outings with your best friend.
  • 🐾 COMFORT HANDLE: The design of this strong dog lead handle provides a safe secure and comfortable grip for pet owners during long walks or runs with their dog.
  • 🐾 STRONG SWIVEL CLIP: Means you can trust that your pet will remain securely attached to this durable black dog lead and makes this dog lead a reliable choice for medium to large dogs.
Product details
Brand
Spanner In The Works
Manufacturer
Spanner In The Works
Material
Rope
Colour
Purple
Size
59.06 inches
Model number
Dog-Lead-Parent Listing
EAN
5065017273422

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
★★★★★
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026
★★★★★

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025
★★★★★

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1–2 of 10 reviews

You might also like

Similar items

View all →