🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$26.99
Spanner In The Works® | Green Dog Lead - Reflective Leashes, 1.5 Metre Long, Thick 13mm Anti Pull Dog Leash | Comfort Handle, Bright Green Dog Leads, Strong 360 Swivel — image 1
Basic LeadsSpanner In The Works✓ In stock

Spanner In The Works® | Green Dog Lead - Reflective Leashes, 1.5 Metre Long, Thick 13mm Anti Pull Dog Leash | Comfort Handle, Bright Green Dog Leads, Strong 360 Swivel

★★★★★
$26.99

Options

8 available
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • 🐾 SAFETY FIRST: Safety is a priority, which is why we have manufactured a strong dog Lead with a reflective weave to the lead. This feature enhances visibility during low-light conditions, ensuring your dogs are visible to passing vehicles and pedestrians, ensuring their safety whilst walking or running.
  • 🐾 STRONG SWIVEL CLIP: Means you can trust that your pet will remain securely attached to this durable black dog lead and makes this dog lead a reliable choice for medium to large dogs.
  • 🐾 COMFORT HANDLE: The design of this strong dog lead handle provides a safe secure and comfortable grip for pet owners during long walks or runs with their dog.
  • 🐾 SUPERIOR DURABILITY: Crafted with care, our dog lead is made from robust 13mm climbing rope and a strong swivel. Ensuring strength and reliability that can withstand even the most adventurous outings with your best friend.
  • 🐾 STRONG DOG LEAD: Suitable for use with either large or for use as dog leads for medium dogs. Whether you have a majestic Great Dane or a spirited Labrador, our 13mm rope dog lead is designed to cater to their needs. The thick 13mm anti-pull dog leash is perfect for strong, large dogs who tend to pull during walks.
Product details
Brand
Spanner In The Works
Manufacturer
Spanner In The Works
Material
Synthetic rope and metal
Colour
Bright Green
Size
59.06 inches
Model number
Dog-Lead-Parent Listing
EAN
5065017273415

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
★★★★★
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026
★★★★★

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025
★★★★★

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1–2 of 10 reviews

You might also like

Similar items

View all →