🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$42.99
RANYPET Long Cat Lead, 9M/30FT Escape Proof Lightweight Cats Lead, Extendable Personalized Cat Leash for Training Playing Outdoor Yard, Reflective Leash for Cats, Puppy, Rabbit and Small Animals Black — image 1
LeadsRANYPET✓ In stock

RANYPET Long Cat Lead, 9M/30FT Escape Proof Lightweight Cats Lead, Extendable Personalized Cat Leash for Training Playing Outdoor Yard, Reflective Leash for Cats, Puppy, Rabbit and Small Animals Black

$42.99

Options

3 available
Size: 30 ft
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • SIZE: Leash length: 30 ft/ 9M. This long cat leash is perfect for pet playing/training/camping/hiking/running/travel, free movement without restraint, and controls pets to avoid loss within your line of sight.
  • REFLECTIVE FOR NIGHT SAFETY: Highly reflective threads cat leash can good protect your kitten at night by improving its visibility. And keep you both safe and visible on your late-evening walks.
  • DURABLE & TANGLE-FREE: The long cat leash is made using super light-weight 5mm braided nylon rope that is both durable and environmentally friendly. The clip is a strong, nickel-plated iron that won’t break. It’s designed to be tangle-free and won’t get caught on underbrush.
  • TWO HOOK DESIGN: This long leash has a secure spring hook at either end of the leash. 360° swivel clasp design, no limtation for your pets while moving from side to side without messing the leash. Enjoy the peace of mind with our 360° swivel leash attachment, allowing your pets to move freely around you.
  • COMFORTABLE: The cat long leash is sturdy and durable yet light enough not to bother your cat. The pet will be happy roaming outside safely without running off after birds and wildlife, and without having our eyes on her 100% of the time. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and so on.
Product details
Brand
RANYPET
Manufacturer
RANYPET
Material
Nylon
Colour
Black
Size
30 ft
Model number
RY01024-Cat Leash-M-FUK
Part number
RY01024-Cat Leash-M-FUK

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 12 of 10 reviews

You might also like

Similar items

View all →