๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$161.99
Nimble Waterproof Dog Leash, Durable Outdoor Training Rope, Long Lead 5ft, 10ft, 13ft, 16ft, 30ft and 50ft, Great for Training, Beach, Patio, โ€” image 1
Training LeadsNIMBLEโœ“ In stock

Nimble Waterproof Dog Leash, Durable Outdoor Training Rope, Long Lead 5ft, 10ft, 13ft, 16ft, 30ft and 50ft, Great for Training, Beach, Patio,

โ˜…โ˜…โ˜…โ˜…โ˜…
$161.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • DURABLE Training Leash: High quality flex poly coated nylon strap material made the Waterproof Dog Leash, strong tensile resistance can carry 600 - 750 lbs pull force.
  • LONG LEASH: Easy to hold handle, made with metal strong rivets. 360 degree swivel clasp made with strong rivets. Itโ€™s great for teaching your dog recalls.Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming! Let our dogs more freedom!
  • Waterproof Lead: It can drag through the water and sand without getting wet. Fast dry sand doesnโ€™t really stick to it, which is a great feature! Good all weather leash!
  • Lightweight SIZE: Perfect Width 1/2 inch (13mm). Various lengths of your choice: 5 feet / 10 feet / 16 feet / 30 feet / 50 feet . Give your dogs more comfortable and fresh!
  • Various Colors: Bright yellow, Apricot brandy red, Purple, Candy Red, Lavender, Emerald Green, Black, Blue, Pink and Orange at your choice. Tips: It is a lead leash, not a chew item, so keep your dog from biting it.
Product description

NIMBLE is a brand found in 2009, which factory is personalized in manufacturing dog collars, leashes, harnesses and many other pet supplies.

Product details
Brand
NIMBLE
Manufacturer
NIMBLE
Material
Zinc alloy hook and rivets, coated nylon webbing
Colour
red
Size
30 feet
Model number
BO - 985
Part number
BO - 985
EAN
0752771334661

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’