🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$54.99
Neolab 1 2034 1.5 Meter 1.5 M Extra Long Lead Straight Cable – White — image 1
Lab FurnitureneoLab✓ In stock

Neolab 1 2034 1.5 Meter 1.5 M Extra Long Lead Straight Cable – White

★★★★★
$54.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • Warm devices feed or connection cable with safety plug, 1.5 M LEAD WIRE AND WARM Steckdose 175 °
  • High strong thanks to the cable cross-section of 1.0 mm²
  • Suitable for most labor devices
  • Maximum load 16 amp @ 220 Volt WS
  • Colour: White
Product description

Hot devices feed or connection cable with safety plug, 1.5 m lead wire and warm Socket 175 °. Highly durable by cable cross-section of 1.0 mm². Suitable for most laboratory devices. Maximum load 16 A @ 220 V WS.

Product details
Brand
neoLab
Manufacturer
neoLab
Material
Lead
Model number
1-2034
Part number
1-2034
EAN
4058072069551

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
★★★★★
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026
★★★★★

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025
★★★★★

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1–2 of 10 reviews

You might also like

Similar items

View all →