![31V 15W String Light Indoor-Outdoor Power Adapter for CZJUTAI JT-DC31V15W /12W /9W /7.2W /6W - IP20 Christmas Lighting [U5T5]](https://images-na.ssl-images-amazon.com/images/I/611n5EQy-GL.jpg)

LightsGo Waterproof Cool White Icicle Christmas Fairy Lights 400 Lights 10 Metres Wide Plus Long Lead Cable - Safe Voltage (400 Lights 10M)
Options
4 availableAbout this item
- 400 LED Lights 10 Metres of Lights (width) Plus 10 Metres Extension Lead Cable (plug to the first light).
- 8 Sparking Modes with Memory Function. It Will Remember Your Last setting. The default mode is Static
- Low Voltage Kids Pets Safe Design. The System is 31V and only 4Watt. Even When the Wire is Broken, It Is Still Safe to Pets and Human. It's So Important if You Have Naughty Children Around.
- Massive 10 Metre or 33 Feet Lead Cable. It's Enough For Most Homes. LED Powered, Low Power Consumption.
- LightsGo branded. Proper Made! CE Passed. Weatherproof, Can Be Used Indoor and Outdoor. Your Safety is Our Priority!
Product description
Perfect for anyone wanting to use fairy lights indoor and outdoor. Perfect for creating the special magical atmosphere for parties. Can be used as wedding table decorations, festive lighting for your home, gifts for Christmas & party centre pieces. Safer and Easier to use. 8 Different Sparking Modes with Memory Function (change to the next mode by pressing the control button once): 1. Combination 2. In Waves 3. Sequential 4. Slo-Glo 5. Chasing / Flash 6. Slow Fade 7. Twinkle / Flash 8. Static On Works with UK standard plug. Energy-saving and long operating life Power Source:Main Cable Colour:White Light Length:4m/6m/8m/20m No. Of Lights:120,300,400 or 800 Bulb Type:LED Brand:LightsGo The Creative Fairy Lights Expert!
Product details
Customer reviews
What customers say about Bigamart
10 Trustpilot reviews total, with 2 shown at a time.
I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.
The package was here in Australia from England in a few days โ so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.
You might also like



