๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$57.99
LightsGo 2 X 2 Metres 200 LED Blue Window Curtain Christmas Fairy Lights, Clear Cable, 8 Hour Timer, Long Lead โ€” image 1
IndoorLightsGoโœ“ In stock

LightsGo 2 X 2 Metres 200 LED Blue Window Curtain Christmas Fairy Lights, Clear Cable, 8 Hour Timer, Long Lead

โ˜…โ˜…โ˜…โ˜…โ˜…
$57.99

Options

5 available
Size: 200 LED
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • Beautiful 2 X 2M 200 LED Curtain Lights in Blue. Low Voltage Kids Pets Safe Design. Please don't buy the 240V dangerous products without a proper transformer
  • 8 Modes with Memory Function Built In: Steady On, Twinkle/Flash, Slow Fade, Chasing, Sequential, Wave and Combination
  • 8 Hour Timer: When activate, it will be on for 8 hours and off for 16 hours.
  • Extra 10 Meters extension Lead from the transformer to the 1st lights. No need to worries about outside power socket
  • LightsGo branded. Proper Made! CE Passed. IP44 Waterproof. Your Safety is Our Priority!
Product description

Perfect for anyone wanting to use fairy lights indoor and out. With the 10 metre extension lead, you can plug the lights in a socket and drape them on your windows or whatever you wish to decorate as these lights shine bright! These lights come with the 200 bright LED lights 2X2 Metres square. Decorate your windows with these lights that can outshine the sun. Power Source: Mains Lights Colour: Blue Cable Colour: Clear Light Length: 2 X 2 metres Cable Lead: Extra Long 10M or 26feet, from transformer/controller to the first light. No need to worries about outside power socket No. Of Lights: 200 Bulb Type: LED Function: Twinkle/Flash, Slow Fade, Chasing, Sequential, Wave and Combination Brand: LightsGo The Creative Fairy Lights Expert!

Product details
Brand
LightsGo
Manufacturer
LightsGo
Colour
Blue
Size
200 LED

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’