🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$47.99
LEOSASA Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Blue) — image 1
Double LeadsLEOSASA✓ In stock

LEOSASA Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Blue)

$47.99

Options

2 available
Color: Blue
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • 【Adjustable Buckle & Extensible Rope for Multi-Use】 – Size of the Coupler: <2.1-3.1 ft > / <25.6-27.4 in> / <65-95 cm>. Each rope is equipped with an Adjustable Buckle, so you can freely adjust the length when training, walking, running, or hiking with your furry friends. The Retractable Shock-Absorbing leash effectively reduces strain on your arms and shoulders when your dog suddenly lunges or changes direction, ensuring a more comfortable experience for both the dog and the walker.
  • 【360°Swivel Clip for Tangle-Free】 – The Splitter is equipped with a 360° Rotating Buckle, allowing for quick release and locking, preventing twisting or knotting. This ensures your dog’s freedom of movement, giving them more space while aving you time from having to untangle the leash as they move from side to side.
  • 【Traffic Control Handle & Reflective Strap for Safety】 – The Handle near the dog's neck is ergonomically designed with soft, thickened sponge padding for a comfortable grip. The non-slip design ensures a firm hold, providing better control over your dog in any situation. Reflective Threads improve visibility, keeping you and your dog safe during nighttime walks.
  • 【Heavy-Duty Clip & Durable Leash Material】 – The Metal Hook is made from durable and rust-proof galvanized zinc alloy. The leash is crafted from high-strength Climbing-Grade Nylon, ensuring exceptional durability and resistance to chewing and tearing. Reinforced Stitching enhances longevity, making it ideal for daily walks, training, and outdoor adventures.
  • 【Premium Quality & Timely Service】 – At LEOSASA, we are committed to providing premium products that enhance the safety, comfort, and happiness of both you and your dog. If you have any questions, please reach out to us, and we will provide you with a satisfactory solution within 24 hours.
Product details
Brand
LEOSASA
Manufacturer
LEOSASA
Material
Alloy Steel Nylon
Colour
Blue
Size
2.1-3.1 feet
Model number
1V2-Y-BLUE
Part number
1V2-Y-BLUE

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 12 of 10 reviews

You might also like

Similar items

View all →