๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$38.99
LATRAT Dog Training Lead 0.36 - 30 m Long Lead for Small to Large Dogs (Red, 10 m x 1.5 cm 32 ft) โ€” image 1
Training LeadsLATRATโœ“ In stock

LATRAT Dog Training Lead 0.36 - 30 m Long Lead for Small to Large Dogs (Red, 10 m x 1.5 cm 32 ft)

โ˜…โ˜…โ˜…โ˜…โ˜…
$38.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • The dog leash is made of strong and durable nylon material, ideal for walking with your dog without any worries. The carabiner is made of stainless steel.
  • Choose the length that best suits your needs, you can control your dog from near or far away: 1.2~30m, with multiple colors: dark blue, red or black.
  • The dog leash comes with a rotating buckle that can be easily attached to your dog's collar and rotates 360 degrees so your pet can play safely.
  • The pull rope is suitable for dogs of all sizes, even on rainy or snowy days, the rope can be used normally and it is easy to clean after training, which provides enough freedom for your dog and can run safely on the lawn or other outdoor places.
  • Dog recall leash ideal for hiking, camping, training, hunting, garden, beach, outdoor play or swimming.
Product details
Brand
LATRAT
Manufacturer
LATRAT
Material
Nylon
Colour
Red
Size
10m*1.5cm๏ผˆ32ft
Model number
GS20230228
Part number
gs20230228

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’