๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$57.99
JnDee Safe Voltage 400 Bright LEDs 40 Metres Warm White String Fairy Lights for Christmas Tree Party Wedding Events, 8 Modes, Timer, Long Lead โ€” image 1
IndoorJnDeeโœ“ In stock

JnDee Safe Voltage 400 Bright LEDs 40 Metres Warm White String Fairy Lights for Christmas Tree Party Wedding Events, 8 Modes, Timer, Long Lead

โ˜…โ˜…โ˜…โ˜…โ˜…
$57.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • Fairy Lights: 400 LED Warm White Indoor & Outdoor Christmas Lights, Mains Powered Fairy Lights with 40m Light length & 10m Lead wire.
  • Low Voltage Kids Pets Safe Design. Safe Indoor & Outdoor. RoHS and CE Certified. No risks of electric shocks. The IP44 rated Adapter is uniquely shaped and sockets with covers/flaps may not close fully when plugged in. Please check your outdoor socket if you plan to use it.
  • 8 Mode with Memory Function: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination
  • 8 Hour Timer: This function provides a set-and-forget operation. When activated, the lights will be ON for 8 hours and OFF for 16 hours. It will be on automatically at the exactly same time the following days.
  • Quality Products, All Weather Lights. Your Safety is Our Priority! JnDee's Christmas Fairy Lights comes with a 2 year warranty.
Product details
Brand
JnDee
Manufacturer
JnDee
Colour
Warm White
Size
400 LED 40M
Weight
0.82 kg
Part number
SS-31vdc-100LED-L-MC-IP44
EAN
0740016303688

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’