๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$45.99
JnDee Safe Voltage 300 Bright LEDs 30 Metres Warm White String Fairy Lights for Christmas Tree Party Wedding Events, 8 Modes, Timer, Long Lead โ€” image 1
IndoorJnDeeโœ“ In stock

JnDee Safe Voltage 300 Bright LEDs 30 Metres Warm White String Fairy Lights for Christmas Tree Party Wedding Events, 8 Modes, Timer, Long Lead

โ˜…โ˜…โ˜…โ˜…โ˜…
$45.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • Fairy Lights: 300 LED Warm White Indoor & Outdoor Christmas Lights, Mains Powered Fairy Lights with 30m Light length & 10m Lead wire.
  • Low Voltage Kids Pets Safe Design. Safe Indoor & Outdoor. RoHS and CE Certified. No risks of electric shocks. The IP44 rated Adapter is uniquely shaped and sockets with covers/flaps may not close fully when plugged in. Please check your outdoor socket if you plan to use it.
  • 8 Mode with Memory Function: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination
  • 8 Hour Timer: This function provides a set-and-forget operation. When activated, the lights will be ON for 8 hours and OFF for 16 hours. It will be on automatically at the exactly same time the following days.
Product details
Brand
JnDee
Manufacturer
JnDee
Colour
Warm White
Size
300 LED 30M
Weight
0.70 kg
Model number
SS-31vdc-100LED-L-MC-IP44
Part number
SS-31vdc-100LED-L-MC-IP44
EAN
0740016303725

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’