🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$45.99
HuaDmaing Leather Dog Lead Long Line Dog Lead Long Leads for Dog Training Slip Lead for Dogs Leather Belt Safety Traction Rope for Medium Large Dogs Walking (6.5-ft Brown)… — image 1
Training LeadsHuaDmaing✓ In stock

HuaDmaing Leather Dog Lead Long Line Dog Lead Long Leads for Dog Training Slip Lead for Dogs Leather Belt Safety Traction Rope for Medium Large Dogs Walking (6.5-ft Brown)…

★★★★★
$45.99

Options

3 available
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • ✪【Quality Material】Our pet leash is made of high-quality Iron and steel synthesis and leather, strong and durable, soft and smooth, wear-resistant and not easy to break. gentle on your dog's skin and your hands. Your leather leash will not become a knotty mess like nylon leashes.
  • ✪【Easy To Use】Our leather training lead leash adopts a rotating lobster clasp design, which can be easily fixed to your dog's own collar,Improved alloy iron/copper 360 degree swivel clasp will resist rust and corrosion for decades. which is very convenient to use.
  • ✪【Application】Our leather training lead leash is very suitable for pets to use when going for a walk. It can effectively control pets running around and prevent pets from being lost. Won't collect hair like a nylon leash, a smart choice for walking, training or running with pets. Classic woven trim, super durable belt. Classic woven trim, super durable belt.
  • ✪【Perfect Size】Our pet dog leash has a width of 0.5 Inch and a length of 6.5ft, which is the most practical pet leash size. can give plenty of space for you and your dog to enjoy a free and safe walking in open area.
  • ✪【Unique Design】The handle position of our pet leash adopts a simple knitted pattern style, which can make it look more fashionable and exquisite.
Product details
Brand
HuaDmaing
Manufacturer
NICE01
Material
Leather
Colour
Dark brown
Size
6.5 ft steel hook
Model number
NC-22-2Bian-A
Part number
NC-22-2Bian

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
★★★★★
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026
★★★★★

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025
★★★★★

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1–2 of 10 reviews

You might also like

Similar items

View all →
HuaDmaing Leather Dog Lead Long Line Dog Lead Long Leads for Dog Training Slip Lead for Dogs Leather Belt Safety Traction Rope for Medium Large Dogs Walking (6.5-ft Brown)… | Bigamart