๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$151.99
Herm Sprenger Rubberised Nylon Long Lead Neon Green Reflective (200cm) โ€” image 1
Basic LeadsHerm Sprengerโœ“ In stock

Herm Sprenger Rubberised Nylon Long Lead Neon Green Reflective (200cm)

โ˜…โ˜…โ˜…โ˜…โ˜…
$151.99

Options

6 available
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • The Herm Sprenger rubberised long lead is made of nylon woven neon green through with a durable black rubber thread and a reflective strip for visibility in low light conditions.
  • With a generous 17cm/16.5cm handle.
  • The resulting lead ensures the on the handle is soothing and safe even in wet or muddy conditions.
  • The rubberised nylon lead dimensions: 19mm wide and a choice of either 120cm / 119.4cm or 200cm / 200.7cm
Product description

The teething sausage from Herm. Sprenger rubberised search lead is woven from neon green nylon, thanks to the durable black rubber thread M8 and a reflective strip for visibility in low light conditions. The leash ensures the handle on the leash is soothing and safe even in wet or muddy conditions. The rubberised nylon lead dimensions: 19mm wide and a choice of either 120cm/119.4cm or 200cm/200.7cm with a 17cm/16.5cm handle.

Product details
Brand
Herm Sprenger
Manufacturer
HS HERM. SPRENGER GERMANY
Material
Nylon
Colour
Green
Size
6feet
Model number
N0692
Part number
5923020073
EAN
4022853210692

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’
Herm Sprenger Rubberised Nylon Long Lead Neon Green Reflective (200cm) | Bigamart