๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$53.99
No image available
Training LeadsWUNDAPETSโœ“ In stock

HEM & BOO DOG PUPPY TRAINING LONG LEAD ORANGE RECALL REFLECTIVE WALKING LEAD SMALL 10MTR

โ˜…โ˜…โ˜…โ˜…โ˜…
$53.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • TRAINING RECALL & DISTANCE CONTROL LONG LEAD, IDEAL FOR ALL DOGS & PUPPIES. MADE FROM STRONG MATERIAL FOR DURABLE USE.
  • PADDED & REFLECTIVE FOR HIGH VISIBILITY, EASILY ATTACHED ON TO HARNESSES & COLLARS. HOW TO USE: PLACE YOUR HAND THROUGH THE PADDED HANDLE; WRAP THE LEAD UP LOOSELY, CREATING LARGE LOOPS.
  • ATTACH THE LEAD TO THE BACK OF YOUR DOGโ€™S HARNESS, WITH ONE HAND ON THE LOOPED LEAD USE THE OTHER HAND TO CONTROL THE LENGTH & SLACK OF THE LEAD.
  • SLOWLY UNRAVEL THE LEAD, LOOP BY LOOP, GIVING YOUR DOG MORE FREEDOM & DISTANCE. TO SHORTEN THE DISTANCE PULL THE LEAD GENTLY TOWARDS YOU & RE LOOP.
  • PRACTICE YOUR RECALL TECHNIQUE, SLOWLY INCREASING THE DISTANCE AS YOUR DOG RESPONDS. BUILD UP TO DROPPING THE LONG LEAD COMPLETELY & LETTING IT TRAIL ON THE GROUND.
  • THIS ALLOWS YOUR TO KEEP PRACTICING THEIR RECALL WITH THE OPTION OF HAVING YOUR DOG BACK UNDER CONTROL WITH THE LEAD IF NEEDED.
  • PLEASE NOTE ALL MEASUREMENTS ARE MANUFACTURER STATED. LENGTH -10M
Product description

TRAINING RECALL & DISTANCE CONTROL LONG LEAD, IDEAL FOR ALL DOGS & PUPPIES. MADE FROM STRONG MATERIAL FOR DURABLE USE. PADDED & REFLECTIVE FOR HIGH VISIBILITY, EASILY ATTACHED ON TO HARNESSES & COLLARS. HOW TO USE: PLACE YOUR HAND THROUGH THE PADDED HANDLE; WRAP THE LEAD UP LOOSELY, CREATING LARGE LOOPS. ATTACH THE LEAD TO THE BACK OF YOUR DOGโ€™S HARNESS, WITH ONE HAND ON THE LOOPED LEAD USE THE OTHER HAND TO CONTROL THE LENGTH & SLACK OF THE LEAD. SLOWLY UNRAVEL THE LEAD, LOOP BY LOOP, GIVING YOUR DOG MORE FREEDOM & DISTANCE. TO SHORTEN THE DISTANCE PULL THE LEAD GENTLY TOWARDS YOU & RE LOOP. PRACTICE YOUR RECALL TECHNIQUE, SLOWLY INCREASING THE DISTANCE AS YOUR DOG RESPONDS. BUILD UP TO DROPPING THE LONG LEAD COMPLETELY & LETTING IT TRAIL ON THE GROUND. THIS ALLOWS YOUR TO KEEP PRACTICING THEIR RECALL WITH THE OPTION OF HAVING YOUR DOG BACK UNDER CONTROL WITH THE LEAD IF NEEDED. PLEASE NOTE ALL MEASUREMENTS ARE MANUFACTURER STATED. LENGTH -10M

Product details
Brand
WUNDAPETS
Manufacturer
WUNDAPETS
Material
ROPE
Colour
ORANGE
Size
MEDIUM
EAN
5055284245871

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’