🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$21.99
Electrolytic Capacitor, 450V 22uf 105 Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, 20Pcs — image 1
CapacitorsGarosa✓ In stock

Electrolytic Capacitor, 450V 22uf 105 Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, 20Pcs

★★★★★
$21.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • 【High Performance】High quality electrolytic capacitors with stable performance
  • 【User】Great choice for electronic professionals or enthusiasts
  • 【Convenient to Use】The specifications of the capacitors is marked on its surface, convenient to use
  • 【Heating Resistant】Heat resisting, low leakage, low loss and low impedance
  • 【Application】Suitable for a wide range of electronic applications
Product details
Brand
Garosa
Manufacturer
Garosa
Material
Plastic
Part number
Garosa8634om7qew
EAN
0717207908854

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
★★★★★
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026
★★★★★

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025
★★★★★

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1–2 of 10 reviews

You might also like

Similar items

View all →