🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$18.99
RUNEAY Double Adjustable Lead for dogs, 3m Long Rope for Small, Medium, and Large dogs — image 1
Double LeadsRUNEAY✓ In stock

RUNEAY Double Adjustable Lead for dogs, 3m Long Rope for Small, Medium, and Large dogs

$18.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • HIGH QUALITY DOG LEAD: Tightly woven from strong nylon, RUNEAY double ended lead for dogs is lightweight, bite-resistant, strong, stable, tear-resistant, and safe
  • HEAVY DUTY D-SHAPED HOOK: RUNEAY double ended lead for dogs comes with 2 heavy duty D-shaped hook. The 7.5cm big D-shaped hook very strong and is not easy to break
  • ADJUSTABLE DOUBLE ENDED LEAD FOR DOGS: RUNEAY 3m double ended dog lead have 3 O-rings and 2 heavy duty hooks. You can adjust different lengths into 100 cm, 150 cm, 200 cm, 250 cm or the full length 300cm
  • WONDERFUL DOG LEAD FOR WALK: RUNEAY double clip dog lead is a perfect outdoor dog training lead for walking, jogging, running, camping and hiking. Perfect equipment for outdoor activities at home, in the park or on the beach
  • LONG LEAD FOR DIFFERENT SIZES DOGS: RUNEAY double ended lead for dogs is suitable for small medium and large dogs, such as Bulldog, Chihuahua, Pug, Jack Russell Terrier, Maltese, Dachshund, Mongolian, Beagle, Yorkshire Terrier, Shih Tzu, Pomeranian, Poodle, Cocker Spaniel, etc.
Product details
Brand
RUNEAY
Manufacturer
RUNEAY
Material
Nylon
Size
300 centimeters

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 12 of 10 reviews

You might also like

Similar items

View all →
RUNEAY Double Adjustable Lead for dogs, 3m Long Rope for Small, Medium, and Large dogs | Bigamart