
Dog Rope Leash with Lightweight Locking Swivel Carabiner, for Medium to Large Breeds, Comfortable Padded Handle, Reflective Stitching for Nighttime Safety and a Durable 5 Foot Long Lead
Options
1 availableAbout this item
- YOUR DOG WON'T PULL LOOSE: You should feel confident that he is not going to pull loose or break your lead attachment. Made specifically for medium and large breeds, our aviation aluminum swivel carabiner has a twist-locking feature that secures your dogs collar or harness to the leash. It holds up to 1000 lbs of force, and won't twist your rope.
- LET'S OTHERS SEE YOU AT NIGHT: Do you ever walk or run on dimly lit paths or trails? Then you know how important it is to make sure others can see you and your pooch. Our bright neon green rope leash has three lines of bright reflective stitching that run the length of the leash, to ensure that you guys will be seen from blocks away.
- WALK IN COMFORT: Our 5 foot leash includes a durable tubular webbing handle and comes with extra padding, for extra comfort. It's easy to hold and will keep your hand from tiring out on those longer adventures.
- CONTROL YOUR DOG IN HIGH TRAFFIC AREAS: Our innovative rope leash ensures complete control while walking your dog in high traffic areas, parks, events or even those tense neighborhood sidewalk encounters. Our comfortable padded handle relieves rope burn and hand tiring for a controlled adventure with your dog.
- We know how important it is to feel confident about the leash that is attached to your dog. Our leash is made with the highest quality materials and built for long-lasting adventures. Our goal is that our rope leash provides the secure confidence and improves the quality of your outings with your dog or your back.
Product description
You’ve waited too long…Start now! Begin using a leash that was built specifically for strong dogs. Having confidence in your leash is so important, and we have thought of everything. Have assurance that your dog will not break free! When you have a large dog or a strong puller, it’s critical that you have a strong secure leash attachment. We went the extra mile, and have put together a lightweight aviation aluminum carabiner attachment that can hold up to 1000 lbs of force. So unless your dog turns into the Incredible Hulk, you don’t need to worry! The quick twist locking feature ensures that the clip will not come loose from your dog’s collar or harness. It also has a swivel attachment that won't twist your rope. Beautiful athletic design that lets you and your dog be seen at night. Safety is our top priority. Making sure that you and your dog light up on your late evening adventures is important to us. We have designed in 3 lines of luminous reflective stitching that run the length of the lead. The length of the leash is 5 feet, is made with 12mm rot and weather resistant polypropylene rope materials. Best for dogs 30-150 lbs.
Product details
Customer reviews
What customers say about Bigamart
10 Trustpilot reviews total, with 2 shown at a time.
I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.
The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.
You might also like



