๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$63.99
Home/Pet Supplies/Dogs/Toys/Interactive Toys
Dingo Waldemar Rutkowski Tug Toy for Dogs - Hand Sewn Microfibre & Polypropylene Dog Chaser for Training, Agility, Tug of War, Fetch, Obedience and Play, Assorted Colours (Long handle) โ€” image 1
Interactive ToysDingo Waldemar Rutkowskiโœ“ In stock

Dingo Waldemar Rutkowski Tug Toy for Dogs - Hand Sewn Microfibre & Polypropylene Dog Chaser for Training, Agility, Tug of War, Fetch, Obedience and Play, Assorted Colours (Long handle)

โ˜…โ˜…โ˜…โ˜…โ˜…
$63.99

Options

2 available
Size: Long handle
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • Microfibre tug toy with tassels is designed for interactive play and training, encouraging dogs to chase, catch, and pull while releasing energy, stimulates natural instincts and improving focus
  • Hand sewn from soft yet durable microfibre with a polypropylene handle variation (straight, bungee, long and 2 handles), ensuring comfort and safety for both handler and dog during active tug sessions
  • The dog toys are suitable for small to medium breeds that enjoy prey-style games, fetch work, agility, chasing the prey and interactive daily training
  • Tug toys sizes - straight handle 55 cm long, bungee handle 40 cm long, 2 handles 60 cm long, and the long handle is approximately 130 cm, measurements may slightly vary due to handmade production
  • Original Dingo dog chaser toys, hand sewn in Poland with strong stitching and attention to detail; each piece unique due to manual production and careful workmanship
Product details
Brand
Dingo Waldemar Rutkowski
Manufacturer
Dingo
Material
Polypropylene
Colour
Assorted
Size
Long handle
Weight
0.09 kg
Model number
15574
Part number
15574
EAN
5904760155770

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’