๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$89.99
No image available
Hands Free LeadsDingo Waldemar Rutkowskiโœ“ In stock

DINGO Dog Walking Belt with Shock Absorber, Large Carabiner for Excess of the Rolled-up Leash, 6 Meters Long Lead, Adjustable Waist Belt with Plastic Buckle, Universal Size, Black (99788)

โ˜…โ˜…โ˜…โ˜…โ˜…
$89.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • The dog walking belt with lead has been made of polypropylene, providing comfort and functionality during walks while allowing hands-free use. It works excellently as an alternative to a traditional leash
  • The leash is 6 meters long, providing adequate freedom of movement for the dog. The leash width is approximately 1.6 cm, making it suitably durable and resistant to abrasion
  • The shock absorber provides shock reduction. The chrome-plated carabiner allows you to leash the dog quickly. The second large carabiner is used to attach the excess rolled-up leash, which can be adjusted as needed
  • We fasten the walking leash below the waist with a plastic buckle, and the stepless adjustment allows the product to be tailored to any silhouette. The lightweight belt with a leash can be used for both daily walks and training
  • Machine washable at 30 degrees Celsius. Dog walking belts, hands-free leashes, training leads, and other pet equipment are handcrafted in Poland by Dingo - the original brand since 1977
Product details
Brand
Dingo Waldemar Rutkowski
Manufacturer
DINGO
Material
Polypropylene
Colour
black
Size
One size
Weight
0.17 kg
Model number
99788
Part number
99788
EAN
5904760997882

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’
DINGO Dog Walking Belt with Shock Absorber, Large Carabiner for Excess of the Rolled-up Leash, 6 Meters Long Lead, Adjustable Waist Belt with Plastic Buckle, Universal Size, Black (99788) | Bigamart