🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$56.99
Home/Lighting/Indoor Lighting/Children's Lighting
Battery Operated Picture Light for Wall, 360° Rotation Motion Sensor LED Picture Lighting USB Dimmable Rechargeable Painting Poster Lights for Display Gallery Artwork (White) — image 1
Children's LightingGeneric✓ In stock

Battery Operated Picture Light for Wall, 360° Rotation Motion Sensor LED Picture Lighting USB Dimmable Rechargeable Painting Poster Lights for Display Gallery Artwork (White)

$56.99

Options

2 available
Color: White
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • 【Motion Sensor Black Picture Light】Switch between 3 working modes by pressing the button: Constant light mode, night sensing mode (activated only in dark environments), and all day sensing mode. The sensing range is 120°/9.84FT, and the led picture light will be automatically turned off after 25 seconds when the person leaves the sensing range.
  • 【3 Light Colors and Stepless Dimming】3 colors are available for adjustment: white light (6000K), natural light (4500K), and warm light (3000K). Short press the button to adjust the light color, and long press the button for stepless brightness adjustment.The choice of different light colors can improve indoor lighting according to needs and personal preferences.
  • 【Large Capacity Battery Painting Light】2200mAh large capacity battery operated picture lights, it can be fully charged in 3-4 hours. It can provide continuous lighting for up to 8 hours, or sustain for 60 days in sensor mode (activated 5-8 times per day).
  • 【Easy Installation】Picture lighting has two installation options are available: you can securely mount it using screws or use the lamp body's base with double-sided adhesive for easy installation in any location. The picture frame light head is 360° rotatable, allowing you to adjust the lighting angle for various lighting effects and facilitating convenient storage.
  • 【Widely Applicable Wall Picture Light】The picture display lights are not only suitable for art lighting in places like photo and gallery, but can also be used as a sensor night light in bedrooms, hallways, bathrooms, vanities, kitchens, etc... It is a combination of beauty and practicality in one art light.
Product description

Product Description

Product details
Brand
Generic
Manufacturer
YM
Colour
White
Model number
PL07
Part number
PL07

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 12 of 10 reviews

You might also like

Similar items

View all →