๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$41.99
AWAVM Dog Slip Lead 6ft, Figure of 8 Dog Lead, Anti-pull Dog Training Leash Rope Lead with Durable Padded Handle, 6FT/182cm, Black โ€” image 1
Basic LeadsAWAVMโœ“ In stock

AWAVM Dog Slip Lead 6ft, Figure of 8 Dog Lead, Anti-pull Dog Training Leash Rope Lead with Durable Padded Handle, 6FT/182cm, Black

โ˜…โ˜…โ˜…โ˜…โ˜…
$41.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • High quality material: Our dog leash is made of high-quality climbing nylon rope, with a unique high-density anti bite layer design inside. The strength is almost twice that of similar ropes! Lightweight and sturdy, suitable for towing small, medium, and large dogs.
  • Adjustable slip ring: The rope dog chain design has an adjustable stopper, suitable for any size of neck. AWAVM provides high-power dog anti slip traction ropes. When the dog pulls, the training rope will tighten; When the dog's behavior is corrected, the training rope will loosen.
  • High reflective surface: A prominent reflective line has been added to the anti pull traction rope, which can be seen by vehicles at night, making it both safe and eye-catching for walking or jogging at night, providing safety protection.
  • Padded handle and perfect length: We have added a soft and sturdy EVA pad to the handle, making it comfortable to control your dog and protecting your hands from rope burns.
  • Super Soft Neck Ring: The AWAVM strong anti slip collar features an ultra soft collar that provides strong neck safety protection for your dog. The rope type dog leash allows your dog to move freely under your control. This dog rope tractor is specially designed to combine the collar and traction rope, making it easy to apply to dogs of various neck sizes. No additional collar or strap required.
Product description

Product description / Directions No

Product details
Brand
AWAVM
Manufacturer
AWAVM
Material
Nylon
Colour
Black
Model number
Dog01
Part number
Dog Lead

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’
AWAVM Dog Slip Lead 6ft, Figure of 8 Dog Lead, Anti-pull Dog Training Leash Rope Lead with Durable Padded Handle, 6FT/182cm, Black | Bigamart