

as - Schwabe Mixo 61746 Electricity Meter/Intermediate Meter - Adapter Plug Box MID-Compliant Electricity Meter to Reduce The EEG Surcharge High Current 400 V CEE Plug and Coupling 5-Pin IP44 Made in
About this item
- EEG surcharge: The electricity meter is MID-compliant and therefore suitable for third-party accrual in companies that are eligible to reduce the EEG surcharge.
- MID-compliant high current electricity meter suitable for the construction site (IP 44)
- 32 A/CEE 5-pin with 2 x 1.5 m cable type H07RN-F56, with 32A CEE plug and 5-pin coupling / 400 V
- Housing made of highly break-resistant special plastic, counter cannot be reset to 0. Quality made in Germany
- Quality: as - Schwabe has been convincing with the highest quality in the field of electrical engineering for over 35 years. Our name stands for Swabian precision, reliability and innovation
Product description
Mixo electricity meters are mobile and are used to detect the consumed electricity. If no measuring device for determining the consumed electricity is installed in the consumer, an external measuring device may be connected via a plug-in connection. MIXO electricity meters ensure tamper-proof detection of measured values. MIXO electricity meters are manufactured for different uses indoors and outdoors either with earthing contact or CEE plugs and the corresponding couplings. Roller counter: MID compliant and sealed. MIXO electricity meters only roller counters are installed, which are calibrated according to the specifications of the calibration supervisory authority. Easy to set up: for the correct recording of the readings, plug the electricity meter between the power source and the consumer. Power counting starts as soon as the consumer is turned on. Power consumption during building renovation: the landlord is obliged to cover the operating costs incurred during the renovation work. During building renovation, use MIXO electricity meters to deduct the consumed electricity from the tenant's operating cost account. Invoice in case of damage: in case of insurance, e.g. In case of damage caused by force majeure such as floods, MIXO electricity meters are used for electricity billing. Among other things, the operating costs of a drying device can be determined with the help of the electricity meter. These costs are covered by the insurance.
Product details
Customer reviews
What customers say about Bigamart
10 Trustpilot reviews total, with 2 shown at a time.
I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.
The package was here in Australia from England in a few days โ so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.
You might also like
Similar items




