🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$29.99
ANSTA Waterproof Phone Pouch, Floating waterproof bag, IPX8 Waterproof Phone Case Dry Bag, suitable for ‎IPhone 14/13 etc Clear — image 1
Dry BagsANSTA✓ In stock

ANSTA Waterproof Phone Pouch, Floating waterproof bag, IPX8 Waterproof Phone Case Dry Bag, suitable for ‎IPhone 14/13 etc Clear

$29.99

Options

1 available
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • 【Distinctive Floating Experience】: The surface of the sleek floating waterproof case is made from imitation leather, and the inner is stuffed with numerous sponges, unlike others featuring air circle padding, which makes your phones were safer in them floating around in the water without worrying about air leakage, and gives your more comfortable experience, (Note: The floatation depends on the weight of phones and water density. The devices more than 220g may affect the floating effect.)
  • 【Upgraded ABS Secure Lock Design】:Upgraded secure lock mechanism, open and close the floating waterproof case with just a simple snap, keeping the floating waterproof phone case completely sealed underwater, then you can capture precious moments with your family and not have to worry about your phone sinking to the bottom of the water! This floating waterproof phone case also comes with detachable lanyards so you can put this floating waterproof case around your neck to carry.
  • 【Ultra Touch Screen Sensitive】: The clear windows on both front and back are made of ultra-thin (0.18mm) materials, which make this floating waterproof phone case easy for a friendly screen touch, perfect for taking clear pictures and videos, texting, sending emails, etc. Besides, this floating phone case also supports screen fingerprints, but not for touch ID. Note: Please set your camera to use the volume buttons to take photos underwater.
  • 【Unique Design On The Back】: Unlike other floating waterproof case with full clear windows on the front and back sides, our floating waterproof phone case conducted an innovative design on the back, it comes with large camera windows on one side, another side is non-transparent so that it can protect your private information such as bank card, ID card, credit card, etc.
  • 【Side Button Friendly Design With Clear PVC Windows】: Innovative design on the side of the floating waterproof case allows you to access the side buttons easily, and ultra-clear windows on both left and right sides, which help you operate side buttons easier and convenienter
Product description

🌊🌊🌊Don't let water ruin your phone - our floating waterproof case has got you covered! With its distinctive floating experience and upgraded secure lock design, our waterproof case is the ultimate solution for capturing memories in and around water. Say goodbye to clunky and unreliable waterproof cases - our sleek and innovative design will keep your phone safe and afloat. Whether you're swimming, snorkeling, or just lounging by the pool, our floating waterproof case is the perfect vacation essential for capturing all your favorite moments. With its ultra touch screen sensitive design and unique back window, our waterproof case is the perfect combination of convenience and protection. Our side button friendly design with clear PVC windows makes it easy to access your phone's buttons and controls, even while underwater. The clear windows on both the front and back of our waterproof case are made from ultra-thin materials, allowing for easy screen touch and crystal-clear photos and videos. With the detachable lanyards included, you can easily carry our waterproof case around your neck for added convenience and peace of mind. Don't let the fear of water damage hold you back - our floating waterproof case is the perfect solution for all your aquatic adventures. Our waterproof case is not only functional, but stylish too - the imitation leather surface adds a touch of elegance to your phone while keeping it safe and afloat. Whether you're at the beach, on a boat, or just enjoying a day by the pool, our waterproof case is the ultimate accessory for worry-free phone use in and around water.

Product details
Brand
ANSTA
Manufacturer
ANSTA
Material
Silicone
Colour
Clear
EAN
0750918131067

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 12 of 10 reviews

You might also like

Similar items

View all →