๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$23.99
Accod Pet/Dog Training Leash (5M Nylon Dog Lead Dog Long Lead Rope with 360 Degree Rotating Stainless Steel Hook for Small Medium and Large Dog(Black) โ€” image 1
Training LeadsAccodโœ“ In stock

Accod Pet/Dog Training Leash (5M Nylon Dog Lead Dog Long Lead Rope with 360 Degree Rotating Stainless Steel Hook for Small Medium and Large Dog(Black)

โ˜…โ˜…โ˜…โ˜…โ˜…
$23.99

Options

1 available
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • Size:5M long and 2.5cm wide.
  • Material:Made of strong nylon and durable metal hook,Strong and wear resistant,Keep your dog under control.
  • Metal hook for easy attachment to your dog's own collar,Rotate 360 degrees without entangle,Make your dog play safer,Suitable for outdoor walking training recall and running.
  • 5M Long Training Lead Leash:Suitable length nylon training rope,Holding the leash soft nylon handle,You can choose the right length you want for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming.
  • Suitable for all kinds of large, medium and small dogs,Strong nylon leash allow you and your dog to enjoy the outdoor.
Product description

Accod 5M long dog training lead leash made of strong nylon and durable metal hook,Rotate 360 degrees without entangle,Metal hook for easy attachment to your dog's own collar,Keep your dog under control. Suitable for all kinds of large, medium and small dogs. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming. Let you and your dog get close to nature, feel the fun of the outdoor. Products Include: Accod 5M Dog Nylon Training Rope x 1 Service: We are committed to providing quality products and services to our customers. If you have any questions, please let us know by email or you are not satisfied with our products. You can return them to us.We will refund your money.

Product details
Brand
Accod
Manufacturer
Accod
Material
Nylon
Colour
Black
Size
5M
EAN
5712443510194

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’