🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$123.99
True HQ 4K HDMI Cable 30m, High Speed 18Gbps (HDMI 2.0), Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet – Extra Long Lead for TV, Projector, Monitor, PS5, Xbox — image 1
HDMI CablesTrue HQ✓ In stock

True HQ 4K HDMI Cable 30m, High Speed 18Gbps (HDMI 2.0), Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet – Extra Long Lead for TV, Projector, Monitor, PS5, Xbox

★★★★★
$123.99

Options

6 available
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • 30m HDMI Cable (Ultra-Long Runs): Built for very long routes to TVs, projectors and AV equipment. Ideal for home cinema, offices and installations where devices are far apart. HDCP 2.2/1.4 and HDR support, backwards compatible.
  • HDMI 2.0 (Ultra-Long Run Setup): Performance is device dependent; at 30m many setups are more stable at 1080p. For 4K or higher refresh rates, a powered HDMI booster/repeater is typically required (or reduce output settings).
  • Reliable Long-Distance Build: Reinforced gold-plated connectors with aluminium alloy shell, 28AWG high-purity copper and flexible soft-matte PVC jacket. Triple-layer shielding helps reduce interference for the best possible long-run signal.
  • Wide Compatibility + Features: Works with HDMI TVs/monitors/projectors, PCs, AV receivers & soundbars, Sky/Virgin, streaming devices and PS5/Xbox. Supports HDR10/Dolby Vision, ARC, Dolby Atmos & DTS-HD (when supported).
  • UK Brand, Dedicated Support: Designed by a UK brand focused on dependable build quality and responsive help. Choose the right length (2m-30m) for home cinema, gaming, offices and professional AV installations.
Product details
Brand
True HQ
Manufacturer
True HQ
Colour
Black
Size
30M
Model number
TRUEHQ-HDMI-30M
Part number
TRUEHQ-HDMI-30M
EAN
5060706610168

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
★★★★★
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026
★★★★★

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025
★★★★★

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1–2 of 10 reviews

You might also like

Similar items

View all →