๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$29.99
3.5mm Jack to 2 x RCA Phono Stereo Audio Cable Extra Long Lead - 3 Meter Gold Plated Connectors โ€” image 1
RCA CablesfitTekโœ“ In stock

3.5mm Jack to 2 x RCA Phono Stereo Audio Cable Extra Long Lead - 3 Meter Gold Plated Connectors

โ˜…โ˜…โ˜…โ˜…โ˜…
$29.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • Brand New,high qualtiy Can be used with any sound device with a headphone Jack, such as iPod, MP3, CD Players etc
  • Connector: 3.5mm Male Plug 2 RCA Stereo Male Jack
  • Light weight and convenient to carry Convert RCA audio to standard 3.5mm audio.Use this cable to connect your iPod to your Home Music System, Home Theater, Receiver, or any audio device that has RCA inputs
Product description

Product description Features: Brand new and high quality Can be used with any sound device with a headphone Jack, such as iPod, MP3, CD Players etc Connector: 3.5MM Stereo Plug to 2 RCA make plug Light weight and convenient to carry Convert RCA audio to standard 3.5mm audio.Use this cable to connect your iPod to your Home Music System, Home Theater, Receiver, or any audio device that has RCA inputs This cable set maximizes signal transfer for optimum sound Package Included: 1 x Audio Y Adapter Cable NOTE:Due to factory production lots, there will be 2 type of the item with the same function.We will send it at random. NO Retail Box. Packed Safely in Bubble Bag. Legal Disclaimer follow guidelines

Product details
Brand
fitTek
Manufacturer
Buyincoins
Colour
black
Size
1x
Weight
0.05 kg
Model number
TGT00410
Part number
TGT00410
EAN
5055205101477

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’