🌍 Worldwide shipping · 30-day returns · Rated Excellent on Trustpilot ★★★★½
Price
$110.99
True HQ 4K HDMI Cable 25m, High Speed 18Gbps (HDMI 2.0), 4K@60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet – Extra Long Lead for TV, Projector, Monitor, PS5, Xbox — image 1
HDMI CablesTrue HQ✓ In stock

True HQ 4K HDMI Cable 25m, High Speed 18Gbps (HDMI 2.0), 4K@60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet – Extra Long Lead for TV, Projector, Monitor, PS5, Xbox

$110.99

Options

6 available
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • 25m 4K HDMI Cable (Extra-Long Runs): High-speed lead for 4K UHD TVs, monitors & projectors. Ideal for long home-cinema routes, offices, meeting rooms and projector installs. HDCP 2.2/1.4, HDR support, backwards compatible.
  • HDMI 2.0 / 18Gbps: Up to 4K@60Hz (device/settings dependent). On 25m runs, many setups are more stable at 4K@30 or 1080p - try another HDMI port, lower output settings, or add a powered HDMI booster/repeater for long distances.
  • Reliable Long-Distance Build: Reinforced gold-plated connectors with aluminium alloy shell, 28AWG high-purity copper and flexible soft-matte PVC jacket. Triple-layer shielding helps reduce interference for a consistent signal over long runs.
  • Wide Compatibility + Features: Works with HDMI TVs/monitors/projectors, PCs, AV receivers & soundbars, Sky/Virgin, streaming devices and PS5/Xbox. Supports HDR10/Dolby Vision, ARC, Dolby Atmos & DTS-HD (when supported).
  • UK Brand, Dedicated Support: Designed by a UK brand focused on dependable build quality and responsive help. Choose the right length (2m-30m) for home cinema, gaming, offices, meeting rooms and professional AV installs.
Product details
Brand
True HQ
Manufacturer
True HQ
Colour
Black
Size
25M
Weight
1.59 kg
Model number
1
Part number
1
EAN
5060706610151

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
Excellent
4.5 average rating
See all reviews →
S
Sigalit
🇮🇱 · January 2026

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
🇦🇺 · November 2025

The package was here in Australia from England in a few days — so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 12 of 10 reviews

You might also like

Similar items

View all →