๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$21.99
20pcs Electrolytic Capacitor, 450V 22uf Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier โ€” image 1
CapacitorsVikyeโœ“ In stock

20pcs Electrolytic Capacitor, 450V 22uf Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier

โ˜…โ˜…โ˜…โ˜…โ˜…
$21.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • [Stable Performance] -- High quality electrolytic capacitors with stable performance.
  • [Specification] -- Working Voltage: DC 450V; Surge voltage: DC 500V; Value: 22uf; Capacitance Tolerance: ยฑ20%; Operating temperature: 105; Dissipation Factor:
  • [Durable &Long Life] -- Heat resisting, low leakage, low loss and low impedance.
  • [Ideal Choice] -- Great choice for electronic professionals or enthusiasts.
  • [WIde Used] -- Suitable for a wide range of electronic applications.
Product description

Features: High quality electrolytic capacitors with stable performance. The specifications of the capacitors is marked on its surface, convenient to use. Heat resisting, low leakage, low loss and low impedance. Great choice for electronic professionals or enthusiasts. Suitable for a wide range of electronic applications. Specifications: Working Voltage: DC 450V Surge voltage: DC 500V Value: 22uf Capacitance Tolerance: ยฑ20% Operating temperature: 105โ„ƒ Dissipation Factor: <0.24 at 20โ„ƒ/120Hz Dimensions: 16 x 27mm / 0.63 x 1.06inch Lead type length: Tin plating copper layer Lead length: 38mm / 1.5inch Type: Polarized Quantity: 20pcs Weight: Approx. 79g Package Included: 20 x Electrolytic Capacitor

Product details
Brand
Vikye
Manufacturer
Vikye
Material
Aluminum, Electrolyte
Weight
0.07 kg
Part number
Vikyesrcyu1niqb
EAN
0746771559520

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’