๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$21.99
10Pcs Axial Polyester Film Capacitor Mylar Capacitor Assortment Kit 0.022uF 630V for Radio Amplifier Circuit Projects โ€” image 1
CapacitorsGarosaโœ“ In stock

10Pcs Axial Polyester Film Capacitor Mylar Capacitor Assortment Kit 0.022uF 630V for Radio Amplifier Circuit Projects

โ˜…โ˜…โ˜…โ˜…โ˜…
$21.99
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
Add to cart
About this item
  • User-Friendly Design: Lightweight and compact with a simple structure for effortless installation and handling.
  • Stable and Reliable Performance: Polyester film capacitors deliver consistent operation with long-term durability.
  • Versatile Applications: Ideal for vintage radios, tube amplifiers, and other classic electronics.
  • Precision Specifications: Rated at 630V with 0.022uF capacitance; compact dimensions (5.7mm diameter ร— 15.3mm length).
  • Perfect for All Skill Levels: A top choice for both professional engineers and DIY enthusiasts.
Product details
Brand
Garosa
Manufacturer
Garosa
Material
Polyester
Weight
0.01 kg
Part number
Garosanca3b24v01
EAN
0717207885407

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’